Commercial Interior Framing & Strip Out
Initial preparation and internal partition framing for commercial space.

Recent residential and commercial strip out work delivered by Liverpool Strip Out across Liverpool & the North West.
Initial preparation and internal partition framing for commercial space.
Complete bathroom strip out (tiles and fixtures) and residential basement clearance.
Clearing debris and soil generated from wall demolition in residential projects.
Floor excavation and utility trenching for commercial plumbing systems.
Complete shell and core internal strip out of commercial property for renovation.
Open-plan commercial area preparation and non-load-bearing wall removal.
Surface stripping and preparation of internal walls in residential projects.
Old wall layers and internal panel demolition for residential spaces.
Demolition and layout framing for commercial corridors and pathways.
Side access area cleared during property preparation
Construction waste collected during a property clearance project
Wall surface prepared during an internal strip out
Professional tools and equipment used for a strip out project
Materials cleared from a pavement and property access area
Overgrown garden area cleared during site preparation
Garden waste and unwanted materials cleared from a property
Garden area cleared as part of property preparation
Overgrown exterior area cleared during property preparation
Electrical area visible during an internal strip out project
Internal brick wall and chimney breast exposed after a soft strip out
Exposed timber ceiling joists after plasterboard and ceiling removal during a strip out
Acrow props and steel beam supporting a structural opening during internal demolition
Moss and debris on a residential roof before clearance work
Residential roof cleared of moss and loose debris
Damaged ceiling material opened up during residential strip out work
Internal doorway and surrounding wall stripped back to brick
Mixed plasterboard and timber waste loaded into a skip after strip out work
Skip loaded with removed materials during a residential property clearance
Internal wall partially stripped of plaster to expose brickwork
Wall beneath a residential window stripped back during refurbishment preparation
Ceiling finishes being removed during an internal residential strip out
Floor edge and lower wall exposed during room strip out preparation
Removed strip out materials being loaded for responsible disposal
Kitchen wall tiles and finishes removed during an internal strip out
Walkthrough footage from a live strip out project.
Site walkthrough of an internal soft strip out — walls back to brick, ceilings opened up and debris cleared ready for the fit-out team.
Get a Free QuoteProfessional soft strip-out in progress—careful removal, responsible waste handling and a clean property ready for refurbishment.
Get a Free Quote